Determining the discount rate for complex investment projects in oil and gas industry
https://doi.org/10.55959/MSU0130-0105-6-59-1-8
Abstract
In the investment programs of modern oil and gas companies (i.e., PJSC Lukoil Oil Company, PJSC Gazprom, PJSC Novatek), complex projects are gaining more and more attention, and in this case the efficiency for an investor should be assessed in terms of the overall effectiveness of projects. As an object of research, the authors consider a set of projects for the types of gas production and transportation activities. This paper studies the question of finding a discount rate with a focus on specific features of oil and gas industry. The relevance of the chosen topic is determined by the need to find a balanced rate of return of a complex investment project for inclusion in the investment portfolio of an oil and gas company. When evaluating the economic efficiency of complex projects that include subprojects of various types, such as mining or transportation, the discount rate of the entire project should be in balance with the regulatory rates for the types of activities presented in the project. In their work, the authors, drawing on the analysis of the formulas of the mathematical apparatus for calculating complex discount rate, propose a variant of calculating the internal rate of return (IRR) for a group of projects for which there is a formed level of normative values of IRR. The article is designed within the framework of economic research methods. The analysis of scientific literature and the comparative approach are combined with the use of methods of economic and mathematical modeling. The theoretical significance of the study consists in the description of the main postulates related to the analysis of profitability of investment projects in oil and gas industry. The practical significance lies in the development of approaches to determining the discount rate when assessing the economic efficiency of complex high-risk projects on the example of gas industry and the possibility of using these approaches in investment and strategic analysis of oil and gas companies.
About the Authors
M. I. BogatyrevRussian Federation
Maxim I. Bogatyrev
Saint-Petersburg
O. S. Kirichenko
Russian Federation
Olga S. Kirichenko
Moscow
Yu. A. Nazarova
Russian Federation
Yulia A. Nazarova
Moscow
I. M. Nikonov
Russian Federation
Igor M. Nikonov
Moscow
N. S. Shcherbakova
Russian Federation
Natalia S. Shcherbakova
Moscow
References
1. Artemkina, L. R., Sopilko, N. Y., & Sukhorukov, A. V. (2018). Optimization of the portfolio of real investments of oil and gas companies. Management of Economic systems: electronic scientific journal, 12(118), 27.
2. Bogatyrev, M. I. (2022). A method for determining the required return on investment of complex projects in the gas industry based on calculations of investment prices and tariffs. Gas Industry, 5(832), 108–116.
3. Boldyrev, E. S., Burenina, I. V., & Zakharova, I. M. (2016). Taking into account risks when evaluating investment projects in the oil and gas industry. Online journal «Science Studies», 8(1), 1–11. http://dx.doi.org/10.15862/48EVN116
4. Chadina, D. N. (2017). Justification of the discount rate choice when evaluating the effectiveness of investment projects in the oil and gas complex. ISSC-2017: Economics. Proceedings of the 55th International Student Scientific Conference, 43–44.
5. Demkin, I. V., Nikonov, I. M., Gabrielov, A. O., Barkhatov, V. D., & Petrova M. S. (2016). Methodological problems of risk analysis of oil and gas projects (part 1). Problems of economics and management of the oil and gas complex, 4, 18–27.
6. Kulakova, A. N. (2011). Determining the profitability of investment instruments that generate atypical cash flow. Audit and Financial Analysis, 1, 135–138.
7. Medvedeva, O. K., & Chub, M. V. (2022). Factors of ensuring the economic efficiency of oil and gas enterprises. Young Scientist, 38(433), 21–23.
8. Merkulov, V. N., & Tkachenko, L. I. (2015). Problems of management of the Russian oil and gas complex, taking into account the influence of new geopolitical factors. Bulletin of the Russian State University for the Humanities. Series: Economics. Management. Law, 1, 61–65.
9. Nazarova, Y. A., & Kondrashina, A. S. (2020). Approaches to assessing the economic efficiency of innovative projects. Bulletin of the Russian State University for the Humanities. Series: Economics. Management. Law, 1, 68–81. https://doi.org/10.28995/2073-6304-2020-1-68-81
10. Nazarova, Y. A., Kropina, E. A., Shishkin, A. G., & Gavryusev, S. V. (2019). Approaches to evaluating the effectiveness of complex investment projects using the example of the fuel and energy complex of the Russian Federation. Economic analysis: theory and practice, 18, 5(488), 895–909. https://doi.org/10.24891/ea.18.5.895
11. Niyazbekova, D. B., & Komarova, A. V. (2020). Determination of the discount rate for oil and gas companies. Materials of the XVI International Scientific conference. Interexpo geo-Siberia. Subsurface use. Mining. Directions and technologies of prospecting, exploration and development of mineral deposits. Economy. Geoecology, 873–882. https://doi.org/10.18303/B978-5-4262-0102-6-2020-094
12. Podkorytov, V. N., & Mochalova, L. A. (2019). Determination of the discount rate for the conditions of enterprises of the mineral resource complex: controversial issues. News of the Ural state mining university, 2(54), 121–125. https://doi.org/10.21440/2307-2091-2019-2-121-12
13. Velikanova, T. V., & Kiforenko, I. K. (2015). The problems of accounting for the risks of investment design of the oil and gas complex. Fundamental Research, 2(24), 5428–5432.
14. Zhdanov, I. Yu., & Zhdanov, V. Yu. (2019). Investment assessment of projects and businesses. Moscow: Prospekt, 120. https://doi.org/10.31085/9785392288175-2019-120
Review
For citations:
Bogatyrev M.I., Kirichenko O.S., Nazarova Yu.A., Nikonov I.M., Shcherbakova N.S. Determining the discount rate for complex investment projects in oil and gas industry. Moscow University Economics Bulletin. 2024;(1):171-186. (In Russ.) https://doi.org/10.55959/MSU0130-0105-6-59-1-8